Distillation columns

The dilemma

You wrote the Corrosion Control Documents and you stuck to API 970 as close as practically possible. You completed Risk-Based Inspection studies for all equipment and eventhough API 581 was a little bit too complex, at least you kept it API 580 compliant. The Integrity Operating Windows were defined together with the CCD and even if you found the work process from API 584 a somewhat conflicting with the process to write the CCD, the variable table is complete.

But ...

Why is the Turn-Around scope for inspection just a list of equipment? What's the scope of work?

Why is it so difficult to get the IOW variables into the unit's alarm table? And how should the management of change for these variables work?

How do I ensure that all my Asset Management work processes align and which elements should the system cover?

This is the kind of challenge Taas.it turns into a solution with you.

The incident

A minor fault in the external electrical substation tripped the entire facility. Quickly you establish that the electrical load shedding didn't work as intended, while the emergency diesel generator did get a signal to start but did not. To top it up, the UPS in the control room failed, causing loss of situational awareness at the panel.

But ...

How are these events connected? 

What really happened?

And how did corporate decision making lead to this vulnerability in the power supply?

Taas.it has the methodology and experience to untie a knot. 

Knowledgable Chemical Engineer

In-depth knowledge of Pressure Equipment Integrity Management, Process Engineering, Corrosion Control and interfacing work processes.

Experienced Incident Investigator

Incident investigation into major asset-related incidents from repeated catastrophic compressor failure to total facility black-out.

Approachable

Easily approachable happy to exchange knowledge and usually quick to respond.

30+

Years of experience

18

Countries

100%

Positive customer feedback (99.9% true)

About

Martinus

Martinus Tazelaar

Process, Corrosion & Integrity Engineer


Personal Blog

"What I can say straight off the bat is that the Relief Valve RBI resulted in hundreds of RV's getting at least a 2-year interval extension. It also resulted in us identifying previously unknown redesign cases that helped us better understand the risk we had to manage.

It is of course difficult to put a real number onto what the actual $ savings are but it is easily multi-millions."

Mechanical Integrity Manager 

Pearl GtL - Qatar

Over thirty years of experience in the process industry across asset‑focused disciplines, including pressure equipment integrity, process engineering, corrosion engineering, risk‑based inspection, process safety assessments, incident investigation, the development of asset management systems and strategies.
And yes, I will audit those too ...

Contact

Taas.it

Zeist
The Netherlands

+31 629 02 52 24

consult@taas.it

CoC/KvK: 42118344

GST/VAT/btw: NL005508776B20 


Alternatively, use the form below to start the conversation: